Vancouver, British Columbia–(Newsfile Corp. – November 2, 2022) – Doubleview Gold Corp. (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) ("Doubleview") is pleased to announce an update to the progress of the maiden NI 43-101 Resource Estimate ("Resource Estimate") currently being completed by ABH Engineering Inc.
The resource estimate comprises a site visit, geological modelling, resource estimation and completion of the final report for publication.
The steps necessary to complete the Resource Estimate can be broken down as follows:
ABH Engineering is currently working through the Geological Modelling phase of the report and will make a site visit in the coming weeks.
Farshad Shirvani, Doubleview president and CEO stated "We are very pleased with the progress ABH Engineering is making on the report. We are working diligently to provide them with updated data as it becomes available, including scandium extraction results from ongoing metallurgical tests, as well as drill hole assay data from recent drilling from the analytical laboratory. The maiden…
KISS PR Podcast Story Source link
This is the "wpengine" admin user that our staff uses to gain access to your admin area to provide support and troubleshooting. It can only be accessed by a button in our secure log that auto generates a password and dumps that password after the staff member has logged in. We have taken extreme measures to ensure that our own user is not going to be misused to harm any of our clients sites.